Hall construction all year round

Construction in Finland poses its own challenges, as weather conditions change drastically throughout the year. Snow loads, severe frosts and autumn rains affect schedules and work methods – but with proper planning, hall construction can be carried out with high quality all year round. Trutec Oy’s steel-structured halls and standardized construction processes enable efficient and safe construction in all conditions.

Why is hall construction successful all year round?

The steel hall is an exceptionally suitable structure for year-round construction. The exterior wall panels and steel structures are prefabricated in factory conditions, which reduces the amount of work on site and keeps schedules better under control. Weather conditions have less impact because:

  • Steel frames can also be installed in winter, when the ground is frozen and has better load-bearing capacity.
  • Precast installations are quick, and there is no need to pour large concrete surfaces outdoors.
  • The need for weather protection is minimal because the frosty weather is dry and temperature fluctuations are small.

This makes Trutec’s delivery process reliable and predictable in all seasons.

Benefits of winter construction

Although many people perceive winter as a challenging time for construction, it also has clear advantages:

✔ Fewer soil problems

Frozen soil holds up well and makes the construction site cleaner.

✔ Better availability and faster schedules

The construction season is focused on spring and summer – availability is better in the winter season and schedules are tight.

✔ No delays due to rain

Heavy rain and wet ground can delay foundation work more than freezing weather.

✔ Easy humidity control

The steel hall structure does not include mass construction that is sensitive to moisture, so moisture management is easier than in traditional construction.

How does Trutec ensure quality under all conditions?

1. Efficient element installations

The wall and wooden ceiling elements of the halls are prefabricated, which shortens the construction site phase and minimizes risks due to weather.

2. Pre-planned work phases

The construction process is not based on the weather, but on a clear schedule. Each stage progresses in a controlled manner, which ensures a consistent end result in all seasons.

3 Experienced installers

Construction in winter requires good lighting, as well as the right working methods and equipment – ​​Trutec installers carry out numerous projects every year during the winter season.

When is the best time to build a hall?

The truth is, the best time is when the company needs it. Since much of the work is done indoors and the steel structure is weatherproof, there is no need to postpone the start of the project depending on the season.

Additional benefit for winter builders

Building permit photos included!
Building permit photos included!
We offer floor plans, sectional drawings and facade drawings free of charge for hall package orders placed by March 31, 2026!

Find out the price of hall construction

Would you like a quote for a hall package tailored to your needs?
Or a preliminary price estimate for planning your construction project?
Contact us, we will be happy to serve you!