Trutec Oy was implementing the new Rush park in Nekala, Tampere. The 3000 m² park, which opened in April 2025, offers a variety of sports activities in a modern and impressive setting.  

__wf_reserved_inherit

Comprehensive scope of delivery

Trutec’s scope of delivery included:

•foundations and plinths

•steel frame and concrete elements

•exterior walls, doors and windows

•glass walls

•roof and rainwater systems

•exterior stairs

•facade cladding

A striking facade

The facade cladding of the site creates an impressive overall appearance for the property. The facade cladding designed, manufactured and installed by Trutec consists of silver-colored and brushed aluminum composite panels installed in two different installation directions. The whole creates an image of the facets of a diamond, in accordance with the name of the real estate company, Nekalan Timantti Kiinteistö Oy.

__wf_reserved_inherit

The coordination of steel structures and facade cladding in this unique project serves as a demonstration of Trutec Oy’s facade expertise. The steel frame of the hall was dimensioned to support the solar panel systems installed on the roof and the airglider, which is a flight track suspended from the ceiling for the most daring players.

“The extensive and competitive scope of delivery and the trust built through our previous joint project made it easier to choose Trutec as the contractor for this project as well”

__wf_reserved_inherit
Rush Finland Country Manager Mikko Vihersalo embracing representatives from the construction consultant, architectural firm, building services contractors and Trutec Oy at the opening of Rush Tampere.