Trutec
Oy

Logistics hall 3000 m²

An open logistics hall built with a steel frame, which is excellently suited for material and goods handling.

Various door solutions and suction pockets for loading docks can be combined with the hall.

Thanks to professional installers and standard structural solutions, Trutec Oy’s hall package delivery is installed quickly.

faktat:
Mitat
63x49
m
Kerrosala
2995
m2
Halli
2980
m2
Sosiaalitilat
15
m2
Hallin vapaakorkeus
7,5
m
Paloluokka
P2

Lähetä tarjouspyyntö