Prima Power Steel Frame

Trutec Oy implemented the steel frame installed in Prima Power’s new factory in Seinäjoki. Trutec Oy was responsible for the steel structure design and the delivery and installation of the steel structures. The project was implemented as a subcontract to Lujatalo Oy.

Prima Power is a major company operating in the international market, specializing in sheet metal working machines and systems.